Day 121 (September 8, 2009)

Made brake pedal and push rod. Made gas petal. 9 hours (499 1/2)

Day 122 (September 9, 2009)

Installed rear brakes. Spent 2 hours locating rear seals - used 15004 to make 31 spline axles fit old housing. Trip to American Speed, (4) trips to Advance, (1) to Napa and (1) to Applied. Paula and I went to Eichelbergers's and picked up (3) master cylinders, (4) reservoirs, (4) grommets and (7) fittings for $30. Mounted master cylinder and started brake lines. Ran to Scott's to pick up (4) switches, (3) fuse panels and(16) Hillman clamps. 12 hours

Day 123 (September 10, 2009)

Ran brake lines to rear and first line towards front. Paula picked up parts. Tried to start fuel line. Line got damaged. Calvin and Dad mounted shifter. Picked up lines at Scott's. 9 hours

Day 124 (September 11, 2009)

Worked on fuel lines most of the day. Installed main line and cell. Fabricated fuel pump mount and filter tie down. Fabricated drive shaft loop and window net tabs. 13 hours

Day 125 (September 12, 2009)

Modified the wing window divider. Bernie started on the grill. Installed trans cooler and shifter linkage. Sean Devine came over and we removed rear springs from Plymouth and installed in Oscar. Sean fabricated bullhead filler pieces. Dad fabricated 27 5/8" driveshaft. 13 hours

Make a Free Website with Yola.