Day 141 (September 29, 2009) 

Dave painted the tail lights. 2 hours

Day 142 (September 30, 2009)

Mom painted the anchor for the fifth point of the seat belt. 15 minutes

Day 143 (October 2, 2009)

Started the car up. Leaks were in radiator hose, oil pan, and trans line. Fixed radiator leak and trans lines. Had to change trans line twice. Rob and Erin McCall came over and helped detail the car. They waxed and cleaned it. They also painted the centers of all the wheels. Did four burnouts in the driveway. Dave came over at lunch time and installed the rear tail lights. 20 hours

Day 144 (October 3, 2009)

Changed the oil pan. Tightened brackets on altinator. Set skrew in steering joint. Torqued the lug nuts. Finished the right motor mount. Greased the king pins. Changed oil filter. Replaced air cleaner stud. Tightened rear spring lock nuts. Installed roll bar padding. Installed truck lid latch. Adjusted toe. Switched radiator cap. Paula went to American Speed for fittings and axel strap. Removed pressure gauge. Installed shift light and TACH. Finished window net. T. B. switch was installed. Dave touched up some spots with paint. Jason polished overflow tank. 22 hours (705)

Day 145 (October 4, 2009)

Installed the overflow. Gave the car a thorough inspection, checked all the fluids, and loaded it into the trailer. 1 hour

Make a Free Website with Yola.