Day 131 (September 18, 2009)

Fabricated front drag link, center link using Crown Vic tie rod ends, and the front panhard bar. Painted the (3) pieces and the rear drums. Adjusted the rear brakes and installed drums. Filled rear with lube. Bolted torque converter. Terry Bobb came over and backed wheel bearings. Installed bearing in kit races with spacers. Installed rotors. Calvin removed the Master ON/OFF Switch from the Datsun and installed in Oscar. 14 hours

Day 132 (September 19, 2009)

Calvin and Dad installed front brakes and lines. Bled system. Worked on wiring. Changed the front springs. Installed and painted bulkhead filler pieces. Paula and Calvin installed belts and seat. Sold off ignition and fuel system pieces. Worked on coolant lines. Took pieces to Dennis Crabill's to weld. 12 hours (597)

Day 133 (September 20, 2009)

Worked on coolant lines and fuel lines. Cameron made first piece for the alternator bracket, cleaned and picked up parts. Matt and Terry picked up wheels. Jason picked up the grill. Denny welded the water outlet. Calvin cleaned the blue valve covers. 9 hours

Day 134 (September 21, 2009)

Bernie worked on the headers. Paula painted, polished and waxed. Matt and Terry balanced the wheels.       3 hours

Day 135 (September 22, 2009)

Jason polished the grill. 2 1/2 hours